Mooring Events: N0121

2018-07-08 16:15:00 ALL 999 ALL deployed (slack mooring) by R/V Connecticut
2018-08-19 19:50:00 barometric_pressure -3 met Barometric pressure sensor reading near zero volts for long periods of time (over 24 hours) before returning to valid readings.
2018-10-26 01:00:00 ALL 20 sbe37 Data from all subsurface SBE37 IMs becoming intermittent.
2018-12-09 16:09:00 ALL 1 sbe37 Last valid data received from 1m SBESM.
2018-12-11 22:00:00 ALL 0 ALL Buoy broke free from its anchor - presently adrift.
2019-09-21 14:00:00 ALL 999 ALL Recovered by Portugese Naval vessel off Ponta Delgado (Azores). Wire rope had been parted below 50m IM (bottom 3 IMs were lost).


Download | Sensor Information | Software | NERACOOS Gulf of Maine Moorings | NERACOOS Home